Civic Foundry Verified

We tell you whether the thing you paid for is working.

  • Open
  • Staffed
  • Working
  • Used

The gap

Everyone measures the programme. Nobody measures the building.

Measured today

  • Learners enrolled
  • Patients seen
  • Jobs created
  • Rand spent

Not measured

  • Is it open?
  • Is it staffed?
  • Do the taps and lights work?
  • Is it used at the capacity it was built for?

Four stages, one asset

One asset, followed for two years.

  1. 1

    Baseline

    Before the build

    • Who is it for?
    • What is the gap?
    • What will “working” mean?
  2. 2

    Delivery

    During the build

    • Built to spec, on time, on budget.
    • Local labour and procurement.
    • Defects at handover.
  3. 3

    Activation

    0 to 6 months

    • Open, services connected.
    • Staff posted.
    • Equipment and furniture in place.

    Where most SA infrastructure fails

  4. 4

    Performance

    12 and 24 months

    • Used against design capacity.
    • Core systems working and maintained.
    • Community rating over time.

Every number observed, not supplied.

Evidence standard

Observed, not reported.

  • Site inspection

    A built-environment professional walks the asset. Geo-tagged, timestamped photos against a checklist.

  • Administrative data

    Enrolment registers, clinic headcounts and municipal meter readings from the operating department.

  • Community survey

    A short SMS or WhatsApp survey. The same respondents each wave, so change is real.

  • Sign-offs

    Contractor and department confirmation, on record.

The Civic Foundry Verified mark means every number was seen, not supplied.

The output

One data set, four reports.

Asset scorecard

Example: primary school · Month 12

  • Open and operating

    Yes, 5 days/week

    Green
  • Staffing

    11 of 12 posts filled

    Green
  • Water and power

    Water interrupted 2 days in 30

    Amber
  • Utilisation

    612 / 720 design capacity = 85%

    Green
  • Building condition

    3 defects open, none critical

    Green
  • Community rating

    4.1 / 5, n=48

    Green

Every line links to a page in the evidence pack.

One visit, four submissions

  • SLP annual report

    Mining, to the DMRE

  • B-BBEE SED substantiation

    For the scorecard verifier

  • ISSB S1 social metrics

    For the integrated report

  • SDG 3 / 4 / 6

    For DFIs and donors

Who pays, and why

Four buyers. One question: is it working?

  • Fund managers

    Cannot currently prove asset performance to their corporate clients.

    Used forClient reporting

  • Mining houses

    SLP audit exposure and community disputes.

    Used forDMRE annual report, board risk pack

  • Development finance

    Results frameworks require independent outcome verification.

    Used forLoan covenant and donor reporting

  • Corporate foundations

    Boards want proof, not photographs of ribbon-cuttings.

    Used forIntegrated report, ISSB disclosure

Pricing

Priced per asset.

  • Retrofit

    R90k to R160k

    • Assets already standing.
    • Activation and performance checks.
  • Full cycle

    Standard

    R180k to R350k

    • Full four-stage cycle.
    • Typical school or clinic, R15 to 40m build.
  • Large

    R400k to R800k

    • Multi-building or major facility.
    • R40m+ build.

Roughly 0.5 to 1% of build cost, inside the capital budget.

Independence

We verify what we did not build.

  • Assets designed or built by others

    Civic Foundry inspects, collects and signs the report.

  • Assets designed or built by CDG

    Civic Foundry collects the data. A named third party, a university unit or registered evaluator, signs the report.

Start with a retrofit audit on a building you already funded.